Canadian CloudSat/CALIPSO Validation Project, Page 1 of 2  ELOG logo
ID Date Author Subject Text
  28   Sat Jan 27 14:17:19 2007 Timothy Lang, Ben JohnsonOperations 27-28 Jan 20072110z - At CARE.  Large chunk of loosely organized
precip to our NW, leading edge about 25-30
km out.  Very light snow at site, associated
  27   Fri Jan 26 13:27:00 2007 Timothy Lang, Ben JohnsonOperations 26-27 Jan 20072020z - On site to perform AMFR scanning,
starting around 2100z.  AMFR staff on site.
 Convair will take off by 2130z.  Sonde launch
  26   Thu Jan 25 17:55:40 2007 Timothy Lang, Ben JohnsonOperations 26 Jan 20070055z - On site to begin AMFR scanning on
snow streamers at 02z.  McGill vertically
pointing X-band operational.  Snow streamers
  25   Wed Jan 24 09:33:48 2007 Gail Jackson, Tim Lang, Ben JohnsonOperations 24 Jan 20071630z On site in preparation for CARE overpass
operations.  Sonde launch scheduled at 1715z.
  24   Tue Jan 23 11:16:45 2007 Gail JacksonAMSUB for Jan 21-22I plotted the AMSUB overpass images for the
Jan 21-22, 2007 operating period and the
89, 150, and 183+/-7 GHz images show very
  23   Tue Jan 23 09:31:19 2007 Gail Jackson, Tim LangOperations Jan 23, 20071600UTC  Tim Lang, Gail Jackson, Peter R arrive
at trailer. Forecast and radar show light
snow precip north and west of CARE site.
  22   Sun Jan 21 19:12:08 2007 Walt Petersen, Tim Lang, Gail Jackson21-22 January Ops02:00  Tim, Gail and Walt on site.  Snowing
lightly.  Preparing for CARE overpass mission.
 Aircraft to be over CARE at ~0600z.  This
  21   Sat Jan 20 09:15:46 2007 Walt Petersen20 January15:30  Arrived CARE.  Peter has been here
since 15:00.  He has cleaned snow off the
HVSD and other instruments.  CARE received
  20   Fri Jan 19 09:25:56 2007 kyoko ikeda2DVD noteOpened up the top at 1611 UTC.  Disregard
the data around that time
  19   Fri Jan 19 06:54:12 2007 Walt Petersen19 January OpsSounding 1200 UTC

13:00 Snow all around CARE, just not at CARE.
  18   Thu Jan 18 09:17:56 2007 Walt Petersen18 January Log and IDL NOTES FROM PAUL HEIN15:00 UTC Kyoko and I got to the site.

Waiting on new model run at 16:00 UTC to
  17   Wed Jan 17 12:57:15 2007 Walt Petersen17 January Down day.  Weather subdued in more westerly-southwesterly
flow.  Next good system looks to be in Thursday
night into Friday.
  16   Tue Jan 16 07:47:40 2007 kyoko ikedatime stamp chanedTime stamps are in Toronto time (UTC-5 hrs).
  15   Mon Jan 15 10:07:25 2007 kyoko ikedaupdateSnow has essentially stopped about 10 minutes
ago. 
We've pointed the radar vertically after
  14   Mon Jan 15 09:05:35 2007 kyoko ikedasnow updateThe cloud layer is thinning and snowfall rate
continues to decrease.
After a coulple of PPI+RHI combination, the
  13   Mon Jan 15 08:16:55 2007 kyoko ikedaAMFR scansAMFR scan: finished vertical pointing in 10
min.  Going back to PPI+RHI strategies.
Will be performing another vertical pointing
  12   Mon Jan 15 08:09:32 2007 kyoko ikedaAMFR vertical pointing1000 UTC : AMFR did a vertical pointing. 
The data showing an upper layer cloud and
a lower layer cloud with a dry layer between
  11   Mon Jan 15 07:55:11 2007 kyokoupdateSnowrate decreasing.
The King City radar showing the back edge
of precipitation.
  10   Mon Jan 15 07:27:23 2007 kyoko ikedaupdateWinds turning.  The low-level winds are now
northeasterly. 
Changed radar directions to ENE.  
  9   Mon Jan 15 05:50:27 2007 kyoko ikedaAMFR scansPPI at 0.5 is too noisy so changed to 1.0
and 1.5 elevation angles.
RHIs in SW startig from 207deg at 0.5-deg
ELOG V2.6.5-1918